Cuplock Scaffolding for Construction, Q235/Q355building Material Scaffolding Accessories Made in China

Still deciding? Get samples of $ !
Request Sample

Product Description

📋

Overview & Basic Info

Model NO.
H-01
Type
Scaffold Frames
Construction
Building Scaffold
Color
Red, Silver, Blue
Certificate
ISO9001 / SGS / CE / CCC
Application
Machine Parts, Scaffold, Slab Formwork
Surface
Painted / Galvanized / HDG
Warranty
2 Years
HS Code
73089000
🏗️

Product Description

Description of Goods

Cuplock scaffolding standard is made from OD48.3x3.2mm scaffolding pipe and scaffold steel tube. Ledgers are crafted from 3.2mm or 3.0mm scaffold tubes. Options include painted cuplock and hot-dip galvanized (HDG) cuplock scaffolding. Painted versions are cost-effective, while HDG versions (also known as lock-up scaffolding) offer superior durability.

Key Accessories

1. Ledger blades: Available in cast or drop-forged types.
2. Top cups: Options for drop-forged or cast steel.
3. Heavy-duty bottom cups and precision-engineered holes for secure locking.
4. Full range of ladders, girders, and diagonal braces available for both surface treatments.

Application Scenarios

Popularly used in slab formwork support, docking beams, infill beams, drop heads, and socket base plates. Compatible with SGB type klock systems and universal jacks.

📸

Detailed Photos

📊

Product Parameters

Item Name Material (mm) Length (m)
STANDARDQ235/Q345, 48.3*3.2mm0.5 / 1.0 / 1.5 / 2.0 / 2.5 / 3.0
SPIGOT CONNECTORQ235, 38*2.5mm0.25 / 0.27
LEDGERQ235/Q345, 48.3*3.2mm0.6 / 0.9 / 1.2 / 1.3 / 1.8 / 2.5
INTERMEDIATE TRANSOMQ235/Q345, 48.3*3.2mm1.2 / 1.3 / 1.8 / 2.5
DIAGONAL BRACEQ235/Q345, 48.3*3.2mmH1.5 L1.8 / H2.0 L2.5
BEAM BRACKETQ235/Q345, 48.3*3.2mm1.0 / 1.5
📜

Quality Certifications

📦

Packaging & Shipping

All products are securely packed in steel pallets, cartons, plywood cases, or woven bags according to client requirements to ensure safe international transport.

Frequently Asked Questions

What is your Minimum Order Quantity (MOQ)?
Our MOQ is at least 1 ton for scaffolding materials.
What are your standard packing methods?
Products are usually packed into woven bags and steel pallets or customized based on your specific requirements.
What are the available payment terms?
We accept 30% advanced payment with the balance against the copy of BL, 100% L/C at sight, or negotiated terms based on order status.
How long is the delivery time?
Delivery typically takes about 20 days after receipt of the advance payment or L/C.
Are you a manufacturer or a trader?
We are an experienced manufacturer specializing in scaffolding and formwork systems for many years.
Do you provide technical support?
Yes, we provide online technical support for installation and system configuration to all our clients.

Related Products