Modular Mobile Aluminum Scaffold Tower Construction Access System Aluminum Scaffolding Tower

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Information
Model NO. Scaffolding Tower Type Mobile
Structural Style Multi-Pole Scaffolding Framework Combined Scaffolding
Supporting Mode Floor Type Scaffolding Lapping Form Cross Ring Scaffolding
Surface Finish Galvanized Material Q355B Steel
Application Office Building, Hospital, School, Mall, Apartment Production Capacity 5000 Pieces Per Month
Product Description
Modular Mobile Aluminum Scaffold Tower

Wedge-type scaffolding belongs to socket-type steel tube scaffolding, which connects the sockets on vertical poles and the plugs on horizontal poles by wedge-shaped pins.

The main components of this scaffolding system consist of vertical poles, horizontal poles, diagonal tie rods, adjustable base jacks, scaffolding planks, adjustable wall connectors, and tripod brackets. All components have been optimized for lightweight design, with the weight of a single piece not exceeding 14 kg, which can be easily lifted by one person, thus greatly improving work efficiency.

Its design principle is that the wide-body wedge-shaped plugs at both ends of the horizontal poles perfectly fit into the wide-body wedge-shaped slots of the vertical poles when struck with a hammer. This design enhances the anti-torsion capacity of the joints and ensures more reliable stability of the whole structure.

Scaffold Detail 1
Scaffold Detail 2
Technical Specifications
Product Name Material Weight Range Surface Treatment
Scaffolding Wedge-type System Q355B 0.8 - 14kg Electro/Hot Dip Galvanized
Standard Specification Chart
Standard Model Specification Weight
LG-36Φ48.6*3600mm14kg
LG-27φ48.6*2700mm10.2kg
LG-18Φ48.6*1800mm7kg
LG-09Φ48.6*900mm3.9kg
Key Advantages
🛡️ Safety

Constructed with socket-type wedge components for superior stability. Full range of matched products eliminates safety risks.

⚡ Efficiency

Extremely simple construction using only a hammer. Erection speed is 3x faster than traditional scaffolding.

🔄 Flexibility

Adaptable to irregular buildings and complex sites. Can be assembled into single, double, or cantilever scaffolds.

💰 Cost-effectiveness

Reduces steel consumption and investment costs. Erection area is 2.5–3 times that of standard steel tube scaffolding.

Applications & Packaging
Packaging 1
Packaging 2
Application 1
Application 2
Application 3
Factory Overview
Production Line
Frequently Asked Questions
What is the primary material used in this scaffolding?
The system is manufactured using high-quality Q355B steel, ensuring strength and durability for heavy-duty construction.
How does the wedge-type connection improve efficiency?
The connection uses wedge-shaped pins that can be secured with a simple hammer strike, making it 3 times faster to erect than traditional systems.
What is the expected service life of the components?
Thanks to the hot-dip galvanizing surface treatment, the components offer excellent corrosion resistance and a service life of over 15 years.
Is the scaffolding suitable for irregular building shapes?
Yes, the system is highly flexible and can be configured for various irregular structures, including single-row, double-row, and cantilever scaffolds.
What is the maximum weight of a single component?
All components are optimized for lightweight handling, with no single piece exceeding 14 kg, allowing for easy one-person operation.
What surface treatments are available?
We offer both electro-galvanized and hot-dip galvanized finishes to meet different environmental and durability requirements.

Related Products