Frames Combined Steel Walk-Through Door Scaffolding H Frame System with Cheap Price

Still deciding? Get samples of $ !
Request Sample

Product Description

i

Basic Information

Model NO.
scaffolding frame
Structural Style
Doors Scaffolding
Framework
Frame Combined Scaffolding
Supporting Mode
Projecting Scaffolding
Lapping Form
High Formwork
Erection Position
External Scaffolding
Part Type
Scaffolding Frames
Size
1219*1930mm
Inner Tube
25*1.5mm
Main Tube
42*2.2mm
Unit Weight
15.33kg/PC
Surface
Pre-Galvanized
Grade
Q195/Q235 etc
Technology
Automatic Welding
Capacity
6000 Ton/Month
P

Product Description

ProductH Frame Scaffolding System
Tube Diameter42MM / 25MM
Wall Thickness1.5MM - 2.5MM
MaterialQ195 / Q235 etc
Surface TreatmentPainted / Pre-Galvanized etc
AccessoriesCross Brace & Joint Pin
ManufacturingAutomatic Welding
Scaffolding Frame View 1
Scaffolding Frame View 2
D

Detailed Images

Detailed Dimensions

Key Features:

  • High loading capacity and strength suitable for interior and exterior masonry construction.
  • Stackable design: Each set reaches 1.7m, allowing for height customization by stacking units.
  • Easy access: Welded horizontal ledgers allow workers to climb smoothly without extra ladders.
  • Complete set: Includes 2 pieces of welded H frame, 2 pairs of cross braces, and 4 joint pins.
L

Packaging & Logistics

Packing 1
Packing 2
Packing 3
Logistics Overview
Q

Quality Control

Quality management and inspection are vital for enterprise development. In a competitive market, material quality control and testing play a crucial role. Quality is the life of enterprise development and a sign of progress, reflecting comprehensive business management and technical standards.

Quality Management
C

Certifications

Product Certifications
?

Frequently Asked Questions

What is your Minimum Order Quantity (MOQ)?
Our standard MOQ is one full 20ft container; mixed items are acceptable.
What are your standard packing methods?
Products are typically packed in bundles or bulk. Customized packaging is also accepted.
What is the expected delivery time?
Delivery usually takes 10-20 days after receiving the advance payment.
Are you a manufacturer or a trader?
We are a professional steel product manufacturer with more than 15 years of export experience.
Can we visit your manufacturing facility?
You are warmly welcome. Once you provide your schedule, we will arrange a professional team to assist you.
Do you supply other scaffolding materials?
Yes, we can provide all related construction materials for your projects.

Related Products