| Still deciding? Get samples of $ ! US$ 26/Piece Order Sample |
Cuplock Scaffolding is a kind of system scaffolding joined by cups. Forged or casted top cups are put upon each bottom at 0.5m intervals along standards. It is extremely convenient to assemble; simply move the top cup, place the ledger blades into the bottom cup, and tighten with a hammer for a heavy-duty, secure connection.


| Component Name | Size | Finishing | Unit Weight (kg/pc) |
|---|---|---|---|
| Cuplock Scaffolding Vertical Post | 48.3mmx3.2mmx1.0m | Hot Dip Galvanized | 5.97 |
| Cup Lock Scaffolding Standard | 48.3mmx3.2mmx1.5m | Hot Dip Galvanized | 8.60 |
| Modular Scaffolding Standard | 48.3mmx3.2mmx2.0m | Hot Dip Galvanized | 11.21 |
| Quick Cup Scaffolding Standard | 48.3mmx3.2mmx3.0m | Hot Dip Galvanized | 17.12 |


| Ledger Component | Size | Finishing | Unit Weight (kg/pc) |
|---|---|---|---|
| Cuplock Scaffolding Ledger | 48.3mmx3.2mmx0.9m | Hot Dip Galvanized | 3.58 |
| Cuplock Scaffolding Ledger | 48.3mmx3.2mmx1.2m | Hot Dip Galvanized | 4.76 |
| Cuplock Scaffolding Horizontal | 48.3mmx3.2mmx2.5m | Hot Dip Galvanized | 9.35 |





With 25 years of experience, we provide BS 1139 and EN 74 certified scaffolding systems. Our facilities span 160,000 square meters with over 300 well-trained workers.



Raw Material Inspection: All materials come with mill certificates and undergo batch testing for full traceability.
Advanced Equipment: 10 mechanical arm welding stations and 6 high-speed laser cutting machines ensure precision and speed.
In-house Laboratory: Final tests are conducted in our own lab to ensure 100% compliance with international standards.
Shubrixa Build