Ringlock Scaffold Hot Dipped Galvanized Scaffolding Ringlock System

Customization: Available
Material: Steel
Type: Scaffloding

Product Description

Ringlock Scaffold Hot Dipped Galvanized Scaffolding Ringlock System
i

Basic Specifications

Framework:
Frame Combined Scaffolding
Supporting Mode:
Projecting Scaffolding
Lapping Form:
Full Scaffolding
Erection Position:
External Scaffolding
Move Method:
Attached Lifting Scaffolding
Scaffolding Part Type:
Scaffolding Props
Construction Properties:
Installation Scaffold
Surface:
Hot Dipped Galvanized
Transport Package:
50 or 100PCS/Pallet
Specification:
Bs1139/En10217
HS Code:
73084000
Production Capacity:
100000 PCS Per Month

Production Description

Component Technical Specifications
MaterialQ235/Q345 steel
Standard (Vertical)Hot dipped galvanized steel tube 48.3*3.2mm
Ledger (Horizontal)Hot dipped galvanized steel tube 48.3*3.0mm
Truss LedgerHot dipped galvanized steel tube 48.3*3.0mm
Brace (Diagonal)Hot dipped galvanized steel tube 48.3*2.5mm
Intermediate TransomHot dipped galvanized steel tube 48.3*3.0mm
Steel plankPre-galvanized "C" Profile (241mm width, 67.5mm height, 1.8mm thickness)
Lattice GirderHot dipped galvanized steel tube 48.3*3.0mm
Side BracketsHot dipped galvanized steel tube 48.3*3.0mm
Base collarHot dipped galvanized steel tube 48.3*3.0mm
Payment termTT - 30% deposit, 70% against BL copy or 100% LC at sight
PackingSteel pallet or customized
Delivery time20-30 days after deposit or LC

Detailed Images

Factory & Laboratory

📜

Certificates & Quality Assurance

📦

Packing and Logistics

Packing details: Bundles in steel pallet or as per specific requirements. Typical delivery lead time is 25-30 days.

?

Frequently Asked Questions

1. What steel grades are used for the Ringlock scaffolding?
We primarily use high-quality Q235 and Q345 grade steel to ensure structural integrity and safety.
2. What type of surface treatment is applied?
The system features a hot-dipped galvanized surface treatment, providing excellent corrosion resistance and durability in harsh environments.
3. What are the standard dimensions for vertical and horizontal tubes?
Standard verticals use 48.3*3.2mm tubes, while ledgers typically use 48.3*3.0mm hot-dipped galvanized steel tubes.
4. How is the product packed for international shipping?
Products are usually packed in steel pallets or bundles (50-100 PCS per pallet) to ensure safety during transport.
5. What is the typical production capacity and lead time?
Our production capacity is 100,000 PCS per month, with a delivery time of 20-30 days after receiving the deposit or LC.
6. Which international standards does the scaffolding comply with?
The products are manufactured in accordance with BS1139 and EN10217 specifications.

Related Products