Ladder Frame Scaffolding: A versatile, safe, and efficient solution for height-related tasks, combining the accessibility of ladders with the stability of scaffolding. It is a cornerstone of modern construction and maintenance operations, offering lightweight materials and enhanced safety features.
Product name
Surface Treatment
Standard
Ladder Frame Scaffolding
Powder coated / Pre galvanized
ISO
Fixed Ladder Scaffolding
Bolted or anchored to the building structure, offering exceptional stability for long-term, large-scale projects like high-rise construction and industrial maintenance.
Rolling (Mobile) Ladder Scaffolding
Equipped with lockable rubber casters for easy movement across work areas. Ideal for interior painting, drywall installation, and warehouse maintenance.
⚙️Specifications
Width (mm)
Height (mm)
Weight (kg)
1524
1930.4
21.45
914.4
1930.4
18.73
1524
2006.6
22.84
914.4
2006.6
18.31
Box Frame & Double Box Frame
📦Main Products
🏭Company Profile
Our factory was founded in 2012 and covers an area of 35,000 square meters with more than 230 employees. We specialize in the production of welded pipes, hot-dip galvanized pipes, and pre-galvanized pipes.
Since 2014, we expanded into the scaffolding business, producing high-quality scaffolding couplers, planks, steel props, ladder beams, and ring lock systems. With complete cutting, welding, and galvanized production lines, our annual output exceeds 50,000 tons, serving markets across North America, Australia, Southeast Asia, and the Middle East.
📜Our Certificates & Exhibition
🚢Packaging & Shipping
❓FAQ
Q1: Are you a factory or a trading company?A1: We have our own steel base for one-stop procurement, providing competitive prices, excellent quality, and fast delivery through our own factories and shared enterprises.
Q2: Can you provide samples?A2: Yes, samples are available if we have them in stock.
Q3: Can you arrange the shipment?A3: Sure, we work with permanent freight forwarders to secure the best rates and provide professional shipping services.
Q4: What is the delivery time?A4: It usually takes 25-45 days after receiving the deposit or L/C, depending on the order size.
Q5: Do you have quality control?A5: Yes, we provide pre-production samples before mass production and conduct a final inspection before every shipment.
Q6: What are your payment terms?A6: We accept 100% irrevocable L/C at sight, or T/T with 30% advance and the balance against the copy of B/L.