High-Quality Cuplock Scaffolding - Reliable Vertical Standards From China

Still deciding? Get samples of $ !
Request Sample

Product Description

📋

Basic Specifications

Model NO.
OSC
Material
Steel
Type
Fixed
Certification
ISO9001
Technics
Welding
Surface
Galvanization
Capacity
25000 Tons/Month
Structure
Multi-Pole Scaffolding
🏗️

Product Description

Cup Lock Scaffold is a modular safety erect scaffolding system. It includes vertical standards, cuplock ledgers, diagonal braces, intermediate transoms, hop up brackets, steel ladders, and scaffold stairs with screw jacks.

📊

Vertical Standard Specifications

Hot-dip galvanized steel. Ø 48.3 x 3.2 mm. Equipped with Top Cups and Bottom Cups. Distance between Bottom Cup: 500 mm.

Art. NoLength (m)Weight (Kg)
OSC-S-0500.503.53
OSC-S-1001.006.31
OSC-S-1501.509.05
OSC-S-2002.0011.82
OSC-S-2502.5014.57
OSC-S-3003.0017.34
📊

Ledger Specifications

Hot-dip galvanized steel. Ø 48.3 x 3.0 mm. Serves as a guardrail and secures a right-angled scaffold.

Art. NoLength (m)Weight (Kg)
OSC-L-0600.62.47
OSC-L-1001.03.92
OSC-L-1501.55.73
OSC-L-2002.07.54
OSC-L-2502.59.35

Our Services

  • Inquiries replied within 24 hours.
  • Experienced sales and technical teams (10+ years experience).
  • OEM services including custom logo marking and labeling.
  • Comprehensive after-sale service and multiple problem-solving solutions.

Frequently Asked Questions

What materials are used in the Cuplock scaffolding system?
The system is primarily made of high-quality hot-dip galvanized steel for durability and safety.
What is the surface treatment of the scaffolding?
The surface is treated with galvanization to ensure long-term resistance to corrosion and weathering.
Can you provide OEM services for my project?
Yes, we provide full OEM services, including custom marking of logos and stickers.
What is your monthly production capacity?
Our current production capacity is approximately 25,000 tons per month.
How is the product packed for international shipping?
All components are packed with steel pallets and loaded into containers to ensure safety during sea transportation.
What is the typical delivery time?
Shipping usually takes place within 20 days after the reception of the deposit or L/C.

Related Products