Hot Sale HS-Cuplock Scaffolding System with Accessories Parts Cuplock Scaffolding Vertical System Construct Standard for Cuplock Scaffolding System

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Specifications

Model NO.
HSCS200100
Material
Steel
Type
Fixed
Structural Style
Tower Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Projecting Scaffolding
Move Method
Integral Lifting
Part Type
Scaffolding Frames
Capacity
1000PCS/Month
HS Code
7616991090

About Our Capability

We are engaged in a wide range of machine business, with more than 10 years of experience in this line. We provide high-quality machines and professional solutions for global users in the machinery fields. From single units to automatic production lines, our commitment to manufacturing efficiency and technological development ensures top-tier performance for our clients worldwide.

Product Overview System Detail
Scaffolding View 1 Scaffolding View 2 Scaffolding View 3

Product Description & Features

HS-CLOCK System Scaffolding

A fully galvanised, multi-purpose steel system for all access, shoring, and vertical load support. Unique node points can lock up to four components in one easy hammer blow, providing a wide range of applications. Node points are spaced at 500mm intervals to ensure correct working lifts and handrail positions.

Main Components

Standard Specifications

Vertical members made from 48.3mm diameter x 3.2mm thick high-grade steel tube. Incorporates fixed bottom cups and moving top cups to secure components tightly.

CodeDescriptionSizeWeight
HSCS050.5M Standard500mm3.43kg
HSCS101.0M Standard1000mm6.00kg
HSCS202.0M Standard2000mm11.38kg
HSCS303.0M Standard3000mm16.34kg

Horizontals (Ledgers and Brace)

CodeDescriptionSize (P)Size (N)Weight
HSCL252.5M Ledger2500MM2434MM8.63KG
HSCL181.8M Ledger1800MM1734MM6.87KG
HSCL121.2M Ledger1200MM1134MM4.60KG

Packaging & Shipping

1. Delivery by Sea: LCL or FCL options available with full original documentation provided.

2. Delivery by Air/Express: Door-to-door service via DHL, TNT, UPS, FedEx, or S.F Express.

3. Delivery Time:
• In Stock: 1-3 days
• Customized: 7-9 days
• Batch Orders: 10-15 days

Packaging 1 Packaging 2 Packaging 3

Frequently Asked Questions

What are the main advantages of your scaffolding system?
We focus on continuous quality and precision manufacturing. Our systems are assembled with superior components to ensure longevity and safety during operation.
Can you customize products according to specific needs?
Yes, our professional design team can modify or design new solutions based on customer requests, provided the minimum order quantity (MOQ) is met.
How do you handle after-sales service?
We remain responsible for the supplied products throughout their usage life, providing technical support and quality assurance.
What is the policy regarding samples?
We provide samples for quality inspection. A sample fee is charged initially but will be refunded once a formal order is confirmed.
What shipping methods do you support?
We support sea freight (LCL/FCL), air freight to your local airport, and express door-to-door delivery (DHL, UPS, FedEx, etc.).
How long does delivery typically take?
Stock items ship within 1-3 days. Customized equipment takes approximately 7-9 days, and large batch orders are usually completed within 10-15 days.

Related Products